Workplace water
Table Top Water Coolers
AA First
5 products on this page-
AA First ArcticStar 55 Water Cooler
Regular price From £499.00 GBPRegular priceSale price From £499.00 GBPSize Confirm the selected configuration
-
AA First ArcticRevolution 75B Water Cooler
Regular price £699.00 GBPRegular priceSale price £699.00 GBPSize Dimensions: 373 × 240 × 488mm (H×W×D)
-
AA First ArcticChill 109 Water Cooler
Regular price £749.00 GBPRegular priceSale price £749.00 GBPSize Confirm the selected configuration
-
AA First ArcticChill 108 Water Cooler
Regular price £699.00 GBPRegular priceSale price £699.00 GBPSize Confirm the selected configuration
-
AA First 3300X Water Cooler
Regular price From £499.00 GBPRegular priceSale price From £499.00 GBPSize Confirm the selected configuration
Cosmetal
2 products on this page-
Cosmetal Niagara Water Cooler
Regular price From £2,399.00 GBPRegular priceSale price From £2,399.00 GBPSize Confirm the selected configuration
-
Cosmetal Hi Class Water Cooler
Regular price From £1,449.00 GBPRegular priceSale price From £1,449.00 GBPSize Dimensions: 407 × 262 × 552mm
Mistral
5 products on this page-
Mistral RDC 160 PV
Price on requestSize Confirm the selected configuration
-
Mistral RDC 160 PV ToBeSure
Price on requestSize Confirm the selected configuration
-
Mistral Drinkpad
Price on requestSize Confirm the selected configuration
-
Mistral Drinkpad Pure White
Price on requestSize Confirm the selected configuration
-
Mistral Drinkpad HD
Price on requestSize Confirm the selected configuration
Practical advice from Café Perfection
Choose water around the way people use it.
Mains-fed coolers need a suitable water connection. Bottled coolers need bottle storage, regular replenishment and safe handling. Taps, undersink chillers and fountains can suit different spaces and ways of filling cups and bottles.
Compare the actual chilled-water output and the busiest refill period. Check which temperatures, sparkling options and dispensing controls are included in the product configuration.
Plan the installation and ongoing care
Check space, ventilation, access, power, plumbing and drainage where required. Include filter replacement and sanitisation in the plan, using the equipment instructions and the agreed service arrangement.