Coffee, water & workplace calculators

Use the numbers before you buy anything.

Use your own assumptions to explore coffee usage, ingredient replenishment, water costs, equipment routes and workplace scenarios. Home customers can use the ingredient, water and coffee comparisons; workplace customers can also model peak demand, employee benefit and paid or subsidised coffee. The outputs are planning aids, not product specifications or guaranteed savings.

Paid or subsidised coffee

Paid coffee / payback

Model an employee or customer charge against drink cost, fixed costs and an entered equipment investment.

Estimated monthly drinks
Annual drink sales / contributions
Annual variable drink cost
Illustrative monthly surplus
Illustrative payback
Illustrative annual surplus
Employee saving vs entered external price/year
What this result suggestsUse the result as a commercial pressure-test.

Change the contribution, drink cost and fixed-cost assumptions to see which variable actually changes the outcome. Then compare the model with the real machine, payment fees, service, VAT treatment and expected participation.

Useful check: run a cautious case as well as your expected case before using the figure in a buying decision.

Illustration only. Enter your own prices, ingredient costs, finance/rental, service and other costs. VAT, tax, wastage, downtime and transaction fees may also apply.

Demand planning

Peak demand

Turn headcount into a peak-hour demand figure that can be checked against verified equipment throughput.

Estimated daily demand
Drinks in peak window
Average peak demand
Average spacing in the peak hour
What to do with the demand figureSize around the busiest realistic period, not headcount alone.

Compare the calculated peak-hour demand with verified manufacturer throughput, recovery and drink-build times. Then allow for queues, cleaning, refilling and the fact that demand rarely arrives perfectly evenly.

Pressure-test the peak share and peak-window length rather than relying on one estimate.

Use this demand figure to compare against verified manufacturer throughput and recovery data. It does not state that any specific machine can meet the calculated demand.

Hydration comparison

Bottled vs mains

Compare entered bottled-water costs with an entered mains-fed route before site suitability is considered.

Illustrative bottled cost/year
Illustrative mains cost/year
Illustrative difference
Bottles handled in the model per year
What this comparison does not showCost is only one part of the water decision.

Use the difference alongside plumbing availability, bottle storage and lifting, peak dispense demand, filtration, hygiene, service access and the outputs you want such as chilled or sparkling water.

A cheaper entered route can still be the wrong operational fit for the site.

Enter your real bottle, rental/purchase, filter, service, water and installation costs. Site suitability, bottle handling, drainage, capacity and hygiene requirements should also influence the decision.

Coffee route comparison

Instant vs bean-to-cup

Compare the entered monthly economics of an instant route and a bean-to-cup route at the same estimated drink volume.

Estimated monthly drinks
Instant monthly cost
Bean-to-cup monthly cost
Entered-cost difference
Decision promptDo not let a small cost difference decide the machine class.

After comparing the entered costs, score the two routes against drink quality, menu range, peak speed, cleaning burden, milk handling, waste, service and what users will realistically maintain.

If the economics are close, operational fit and drink experience usually deserve more weight in the shortlist.

Cost alone does not decide the right route. Compare drink quality, menu range, cleaning, speed, reliability, service, waste and the actual equipment configuration alongside the figures entered here.

Replenishment

Ingredient usage

Estimate monthly ingredient weight and packs from the verified dose you enter.

Estimated monthly ingredient
Estimated packs per month
Average weekly usage
Replenishment planningTurn consumption into a reorder rhythm, not a guess.

Start from the verified dose, then compare the calculated monthly requirement with real order history. Add a sensible buffer for delivery lead time, recipe variation and wastage rather than simply ordering the exact mathematical minimum.

Review the estimate after the first few real delivery cycles and adjust it to actual consumption.

Use the verified product or machine dose for grams per serve. Allow separately for priming, cleaning, recipe variation, staff use and wastage if relevant.

Time scenario

Workplace productivity

Explore the time that could remain on site when employees replace an external drinks trip with an on-site drink.

External trips replaced/year
Hours retained on site/year
Indicative time value/year
Use this carefullyValidate the behaviour before valuing the time.

Observe how often people actually leave site for drinks, how long those trips take and whether an on-site offer would genuinely replace them. The time value is an opportunity-size scenario, not a guaranteed productivity saving.

For a business case, separate time retained on site from any claim about profit or output.

Scenario only, not a profit forecast. It assumes every entered trip is actually replaced and that retained time has the hourly value entered. Breaks, wellbeing, behaviour, payroll and productivity effects vary by workplace.

Staff proposition

Employee benefit

Compare an entered external drink price with a free or subsidised workplace drink.

Employee saving per drink
Employee saving across users/year
Employer contribution/year
Workplace drinks/year
Compare three policiesFree, subsidised and paid drinks solve different problems.

Run the calculator more than once: a free-vend case, a partial staff contribution and a paid-vend case. Compare the employer cost with the employee saving and the experience you want to create.

Payment hardware, transaction fees and any employment/tax treatment sit outside this simple model.

Illustration only. This is not tax, payroll or employment-benefit advice. Use comparable drinks and your real costs, participation and operating days; confirm any tax treatment with a qualified adviser.

How to use the tools

Run more than one scenario before you trust the answer.

These calculators are deliberately transparent planning aids. The strongest use is comparison and sensitivity testing — not treating one set of assumptions as a forecast.

1 · Expected

Run the scenario you genuinely expect

Use realistic participation, drinks, costs and operating days. Avoid making a calculator prove the answer you already want.

2 · Cautious

Run a weaker-demand or higher-cost case

Reduce participation or increase a key cost and see whether the conclusion changes. A decision that only works in the best case is fragile.

3 · Operational

Add the things a spreadsheet does not feel

Queues, cleaning, bottle handling, milk care, service access, refill time and user behaviour can matter more than a small monthly cost difference.

4 · Verify

Replace assumptions with live data before ordering

Use current product specifications, real supplier/service costs, payment fees and site information when the decision moves from planning into procurement.

Complete-system snapshot

Compare one live product from each equipment route.

This starter table shows a coffee, water and hot-water product using current store data and verified metafields only. Use the Theme Editor to replace them with two or three like-for-like products for a category comparison.

Check the exact configuration, capacity, utilities, installation, availability and service requirements with Café Perfection before committing.

Use the numbers

Turn the result into a practical next step.

Use the result to narrow the route, then check the actual product, installation and support requirements before ordering.

Workplace coffee and water demand planning
Brief

Build the requirement

Use the Solution Builder to turn the numbers into a clearer home or workplace coffee, water or complete-setup route.

  • Home or workplace
  • Drink priorities
  • Daily demand
  • Water and plumbing
  • Buying or support route
Café Perfection coffee route comparison
Coffee

Compare coffee routes

Move from the cost model into the real equipment range and compare systems against the demand you calculated.

  • Bean-to-cup
  • Commercial coffee systems
  • Purchase or quote-led rental
  • Ingredients & service
Mains-fed, bottled and tap water comparison
Water

Check the hydration route

Use the cost comparison alongside plumbing, storage, handling, hygiene and actual peak demand.

  • Mains-fed
  • Bottled
  • Tabletop & floorstanding
  • Service & filtration
Café Perfection site survey and real specification planning
Site

Turn estimates into a real specification

Send Café Perfection the numbers plus the site details so equipment and installation can be checked properly.

  • Site review
  • Utilities
  • Equipment shortlist
  • Commercial route
  • Service plan

Final equipment, installation and service requirements depend on site conditions, verified manufacturer data and the agreed scope.