← Back to AA First Ezytap Chilled & Hot System

Take a closer look

Your product overview, ready to keep.

Save the selected model and recorded specifications in a Café Perfection sell sheet. Manufacturer manuals and cleaning instructions are listed separately.

Preview & print

The overview is not an installation or operating manual. Confirm your chosen configuration and any optional equipment before ordering.
Café PerfectionEstablished 2002 · Product information

AA First Ezytap Chilled & Hot System

Selected option: 7800 / 4L Boiler / 18.5cm

Product reference: EZYT75 + UC800M

AA First Ezytap 7800 tap and drip tray — 7800 configuration shown; under-counter units not pictured
Product photograph; confirm the selected configuration.

Bring hot and chilled water to one refreshment point while keeping the supporting equipment below the counter. The AA First Ezytap 7800/8800 range pairs an electronic tap with a boiler and UC800M chiller.

One tap, carefully matched equipment

Choose a 4-litre or 8-litre boiler arrangement and the appropriate tap height. Recorded hot output differs between those systems; chilled production is 11.5 litres per hour. The cabinet needs room for both units, their ventilation and service access. We can help confirm the complete installation and any tray or drainage work.

Specifications & details

7800 / 4L Boiler / 18.5cm

AA First Ezytap Chilled & Hot System — Recorded product details
InstallationRequires worktop modification, mains water, filtration/scale control, electrical services, chiller ventilation and compatible Ezytray/drainage.
7800/7800T14 L/h hot + 11.5 L/h chilled
8800/8800T28 L/h hot + 11.5 L/h chilled
Rapid draw-off3.5 L hot (4L system) / 7 L hot (8L system) + 2 L chilled
UC800M260 × 290 × 400mm

Figures apply to the stated configuration. Allow for service access and confirm the utilities and optional equipment in your quotation.

Suitable applications

Office kitchens
Hospitality
Premium workplace refreshment

Installation

Requires worktop modification, mains water, filtration/scale control, electrical services, chiller ventilation and compatible Ezytray/drainage.

Care & servicing

Planned boiler descaling, chiller service, filter replacement and tap sanitisation required.